Jebudo Sea Parting Times

14-day tidal land-bridge schedule

Loading…
14-day schedule
DateOpen windowIndexWeather
Loading…
β€» Times are KST. (+1d)=next day; around spring tide the road stays open all day / continuously. Times from KHOA forecast; weather & index from the experience-index data.
⚠️ Safety: The road is only safe during the open window and floods quickly as the tide returns, which can strand you. Always leave well before closing and check weather and on-site control. Forecast-based reference; may differ from actual conditions.

πŸ“Š Source: KHOA sea-parting forecast
FAQ
When does the Jebudo sea path open?
It opens 1-2 times a day at low tide, and around spring tide can stay open all day. The table shows a 14-day schedule from KHOA forecast. Times change daily.
Where does the Jebudo road connect?
A ~2.3km tidal road links the mainland (Seosin, Hwaseong) to Jebudo island at low tide, drivable by car.
Advertisement (AdSense)

Jebudo Sea Parting (Moses Miracle)

Jebudo in Hwaseong, Korea reveals a ~2.3km tidal road at low tide, letting cars cross from the mainland (Seosin) to the island. It opens 1-2 times a day, all day around spring tide, at times that change daily.

Checking the times

The table shows a 14-day schedule from the KHOA sea-parting forecast, with weather and index from the experience-index data, in Korea Standard Time.

Stay safe

The road is only safe during the open window and floods quickly. Leave well before closing.

Share